New-Construction Landscaping in Cedar Hills | J&H Landscaping

Cedar Hills, Utah

New-Construction Landscaping in Cedar Hills, Utah

Your dream yard. Done right. Done on time.

Get a free Cedar Hills quote

Tell us about your project. Jackson gets back to you fast.

New construction landscaping for Cedar Hills homes, from bare dirt to a finished yard inside the city's 12 month deadline, with the lawn rules and permits handled.

4.8 stars, 140+ reviews Bare dirt to finished yard
★★★★★ 4.8 stars on Google 130+ five-star reviews Bare dirt to finished yard Fast replies, honest pricing
“They installed our backyard in a new construction home we bought this summer, and they helped us get exactly what we wanted within our budget.”
Jamie KrommenhoekGoogle review
“We would absolutely hire this team again and recommend them to anyone looking for landscaping help.”
Holly AdamsGoogle review

New-Construction Landscaping in Cedar Hills

Bare dirt and a 12 month clock

New homes are still going in around Cedar Hills, including new plats and townhomes in The Cedars. Once your home passes final inspection, the city gives you 12 months to get the front yard landscaped. Miss it, and the city can enforce with citations and fines. Your HOA, if you have one, may set its own date on top of the city's, so it pays to know both on move-in day.

The rules for a new front and side yard are clear. When a contractor installs it, lawn can cover no more than 35 percent of the landscaped area, has to be at least 8 feet wide and stays out of park strips and off slopes over 25 percent. Xeriscape beds need drip. Rock, boulders and localscapes count toward the yard, and pavers are allowed in landscaping strips.

The dirt the builder left is the other half. A new lot on the bench is often a mix of cut and fill from the foundation dig, packed hard by trucks. We loosen it, bring in topsoil where lawn and beds go, set grades away from the house and tie the sprinklers into the city's metered secondary water. If the lot sits in the H-1 Hillside zone, grading needs the city engineer's permit first.

Cedar Hills calls itself Utah's mile-high city, a family town on the bench at the mouth of American Fork Canyon where even a short retaining wall needs a permit, the secondary water is metered, and hillside lots in The Cedars and Canyon Heights follow their own grading rules.

Know your Cedar Hills ground

Elevation
About 4,900 to 5,300 feet, depending on the lot
Ground
An old Lake Bonneville shoreline bench and alluvial fan, so the ground can change from one lot to the next
Secondary irrigation
Cedar Hills runs its own pressurized irrigation, usually April 15 to October 15, and since July 1, 2025 bills it by actual use
Growing season
USDA zone 7a, last frost late April
Wall permits
In Cedar Hills fences and retaining walls need an installation permit, even walls under 48 inches, walls over 4 feet need a professional engineer's stamp, and H-1 hillside slopes of 30 percent or more stay natural
Where we work
The Cedars, Canyon Heights, Mahogany Acres, the Cedar Hills Golf Club area, the Cedar Hills Drive corridor, the Gateway retail area
Front lawn and planting on a new build by J&H Landscaping in Utah County
Front lawn and planting on a new build
Front lawn on a new build by J&H Landscaping in Utah County
Front lawn on a new build
New-build front yard at dusk by J&H Landscaping in Salem
New-build front yard at dusk

The Cedar Hills challenges

New-build problems in Cedar Hills

Running out the 12 months

Move in, then winter, then a busy spring, and the deadline is suddenly close. Secondary water only runs from about mid-April to mid-October, so a fall closing leaves less time than it seems. Booking the design over the winter keeps the build ready for spring.

A lawn plan that breaks the code

Builder sketches and neighbor ideas often show grass edge to edge. On a contractor-installed front and side yard here, that plan fails the 35 percent cap and the 8 foot width rule. We draw it to code from the start so it passes when the city looks.

Compacted, mixed-up subsoil

Trucks and equipment pack a new lot like a road. Sod on top roots shallow and dies back in the first hot summer. Ripping the ground and adding screened topsoil costs less than replacing the whole lawn a year later.

Hillside lots with extra rules

Homes in The Cedars and Canyon Heights are built in the H-1 Hillside zone. Slopes of 30 percent or more stay natural, natural vegetation stays except where the home and yard go, and grading needs a city engineer's permit. A plan that ignores that can stall the whole job.

The J&H approach

Bare lot to finished yard

1 How we handle it

Plan back from the deadline

We start from your final inspection date and work backward. If time is tight, the front yard gets built first, with sleeves and lines run for the back, so finishing later does not mean digging up the front.

2 How we handle it

Fix the ground before the green

We rip compacted soil, haul in screened topsoil and shape grades so water leaves the foundation. Under any patio or walk, road base goes down in compacted layers. The yard starts on good ground instead of builder fill.

3 How we handle it

Permits and water set up right

We draw the site plan for any wall, fence, patio or pergola, get HOA approval where needed and file the installation permits. The sprinklers tie into the city's secondary water with lawn, beds and drip on their own zones.

What homeowners say

Real reviews from Utah County

4.8 130+ five-star reviews across Utah County
Lit stone retaining wallUtah County
Verified Google review

"We had a really big project (full lot project) and a crazy timeline, and Jackson and his team were awesome. They are very efficient, work hard to get things done quick, and the quality of their work is top-notch. Great company. Great guys. I would highly recommend them for any landscaping needs."

JC
Jordan Christensen
August 2026
Lit steps and stone wall by J&H Landscaping in Saratoga Springs
Lit steps and stone wallSaratoga Springs
Verified Google review

"Jackson and his crew did a phenomenal job on our back yard. I had a vision and they brought it to life. We had them do a retaining wall, grading, underground trampoline, sprinkler system, and sod. They met deadlines, communication was on point, and the whole crew was friendly.…"

SG
Shawn G.
April 2023
Curved lawn and court by J&H Landscaping in Mapleton
Curved lawn and courtMapleton
Verified Google review

"…The job was completed quickly without sacrificing quality, and the results exceeded our expectations. We would absolutely hire this team again and recommend them to anyone looking for landscaping help."

HA
Holly Adams
May 2026
See all our work and reviews

Cedar Hills questions

New-Construction Landscaping in Cedar Hills: what people ask

How long do I have to landscape a new home in Cedar Hills?
City code requires the front yard of a new home to be landscaped within 12 months of final inspection, and the city can enforce it with citations and fines. Your HOA, if you have one, may set its own timeline. We confirm current rules with the city and plan the job around your date.
Can my new yard be mostly rock and plants?
Yes. Cedar Hills counts boulders, rock areas, xeriscape and localscapes as landscaping. Lawn on a contractor-installed front and side yard is capped at 35 percent anyway. We design the rest with drip-watered beds and rock so it looks finished, not empty.
Can you start before secondary water is on?
Yes. Grading, walls, hardscape and the sprinkler pipe can all go in before the water turns on around April 15. Sod and plants wait until the system is running. Starting early in spring gives you the full water season to get the lawn rooted.

Your dream yard. Done right. Done on time.

Ready for new-construction landscaping in Cedar Hills?

Tell us about your project. Jackson takes a look and gets you an honest quote, no pressure.

Known for
  • Clear pricing
  • Fast turnarounds
  • Highest quality in Utah County
Call or text(385) 213-2539 Free quote